China Manufacturer Lianggong Forming Construction Concrete Steel Timber Beam Slab Roof Formwork with Scaffolding Prop
Description
Basic Info.
Model NO. | slab formwork |
Bearing Capacity | 5~15kn/Square Meter |
Standard Size | 2440*4880mm and 3300*5000mm |
Transportation | by Trolley or Crane |
Length | 3300~5000 mm |
Width | 2440~3600 mm |
Color | Yellow, Blue or Customized |
Application | Slab Pouring |
Transport Package | Steel Pallet or Customized |
Specification | Customized |
Trademark | LIANGGONG |
Origin | Jiangsu |
Production Capacity | 15000 Square Meters/Month |
Product Description
Product Description
Table Formwork
Table formwork is a kind of formwork that is used for floor pouring, used widely in high-rise buildings, multi-level factory buildings, underground structures, etc. During the construction, after the pouring completion, table formwork sets can be lifted by lifting the fork to an upper level and reused, without the need to dismantle. Compared with the traditional formwork, it is featured by its simple structure, easy disassembly, and reusable. It has eliminated the traditional way of slab support system, which consists of clocks, steel pipes, and timber planks. The construction speeds up obviously, and manpower has been saved greatly.
Main Components
Application
Packing & Delivery
Packing:
1. Generally, the total net weight of the loaded container is 22 tons to 25tons, which needs to be confirmed before loading. 2. Different packages are used for different products: ---Bundles: Timber beam, steel props, tie rod, etc. ---Pallet: Small parts will be put in bags and then on pallets. ---Wooden cases: It is available at the customer's request. ---Bulk: Some irregular goods will be loaded in bulk the in the container. Delivery: 1. Production: a For full container, normally we need 20-30 days afreceivingeive customer's down payment. 2. Transportation: It depends on the destination charge port. 3. Negotiation is needed for special requirements.
Our Service
1.Consulting,Design,and QuotationOffer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project dem and. Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD. 2. Manufacture and Quality InspectionLarge-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with-qualitylity standard produce testTreportsport will be available according to different norms from different regions to offer no worries to clients or meet destination authority requirements.3. Packing and ShipmentFrom fabrication to loading, use standard export packages to get to your site quickly. 4. Remote or On-site instructionIf you have any questions, we can provide remote or on-site guidance aim is to make customers feel at ease and satisfied throughout the process.
Our Company
FAQ
Q: Are a you trading company manufacturerture?
A: We are a factory
Q: How long is your delivery time?
A: Generally it is 5-15 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity
Q: Do you provide samples? Is it free or extra?
A: Yes, we could offer the sample for free but you do need to pay for the freight cost
Q: What's your payment termA: ≤ $1,000, 100% inadvance, ≥$1,000, 30% TT in advance, balance before shipment. If you have another question, please feel free to contact us!
Prev: Middle Steel Adjustable Shoring Jack Prop Shoring System Waler Beam Formwork for Concrete Slab
Next: H20 Beam Construction System Plywood Shuttering Formwork for Concrete
Our Contact