Large Wholesale Supply Selling Concrete Slab Formwork
Package Size 180.00cm * 120.00cm * 30.00cm Package Gross Weight 200.000kg Panel - Prop early stripping Green Formwork Sy
Description
Basic Info.
Model NO. | MB1812-MB606 |
Type | Fixed |
Structural Style | Tower Scaffolding |
Framework | Frame Combined Scaffolding |
Supporting Mode | Projecting Scaffolding |
Lapping Form | High Formwork |
Erection Position | Internal Scaffolding |
Move Method | Attached Lifting Scaffolding |
Scaffolding Part Type | Scaffolding Props |
Construction Properties | Building Scaffold |
Brand | QS |
Place of Origin | China |
Surface | Hot Dipped Galvanized,Painted,Powder Coated |
Material. | Q355 |
Transport Package | Metal Pallets |
Specification | 2m/3.6m, 1.75m/3m, 2.2m/4m |
Trademark | QS |
Origin | China |
HS Code | 73084000 |
Production Capacity | 2000tons/Year |
Packaging & Delivery
Package Size 180.00cm * 120.00cm * 30.00cm Package Gross Weight 200.000kgProduct Description
Panel - Prop early stripping Green Formwork System - Aluminium Formwork / Steel FormworkBased on the concept of Green Construction,after the study of 10 years,we have developed the Panel-Propformwork system with early stripping mechanism.It is a puzzle style system which can be erected or stripped or removed with high efficiency and solid safety.It's a new invention, the most advanced Early Stripping System in the world. We call it Green Formwork-- Panel-Prop Early Stripping System . It has unbeatable advantages. SAFE -The independent table with 6 directions moving restriction.It's a very stable system. EFFICIENT - It includes only few components, set and removal are very simple. With early stripping mechanism,it can shorten the construction period and save your time. The erection speed is as high as 60-100 squre meters per person per day.REDUCED TOTAL COST - Thanks to the early stripping mechanism,the number of panels becomes less and the cost,transportation and storage is reduced. MINIMUM OPERATORS - 3-4 workers in a team can quickly and easily set up and remove the panels. There are 3 basic components in Green Formwork System,do not require braces: 1)Panel with plywood faced on top of a steel frame2)Prop with early stripping mechanism3)Assembly/Disassembly Tool Through the combination of panels,aux beams and bridge beam ,the system deals with complex slab structure by very simple way. If you have projects in hand ,please do not hesitate to contact us.We are committed to Excellent Services, Innovation & Quality Enhancement.
Name | No. | model | specification | area(m^2) | unit weight (kg) |
PANEL | 1 | MB1812 | 1.8X1.2м | 2.16 | 45 |
2 | MB189 | 1.8X0.9м | 1.62 | 39 | |
3 | MB186 | 1.8X0.6м | 1.08 | 31 | |
4 | MB1512 | 1.5X1.2м | 1.8 | 41.4 | |
5 | MB159 | 1.5X0.9м | 1.35 | 33.3 | |
6 | MB156 | 1.8X0.6м | 1.08 | 25.8 | |
7 | MB1212 | 1.2X1.2м | 1.44 | 34 | |
8 | MB129 | 1.2X0.9м | 1.08 | 28 | |
9 | MB126 | 1.2X0.6м | 0.72 | 23 | |
10 | MB99 | 0.9X0.9м | 0.81 | 23 | |
11 | MB96 | 0.9X0.6м | 0.54 | 19 | |
12 | MB66 | 0.6X0.6м | 0.36 | 13 |
Till now, Green Formwork has been used in U.S.A ., Canada, Czekh republic,U.A.E, Malaysia, Indonesia,Philippines,Thailand,Burma, Cambodia.Safe,efficient,easy operating and cost-effective.
Company
QINGDAO SCAFFOLDING CO.,LTD." is the leading manufacturer and exporter in whole China for all kinds of scaffolding products and formwork systems. We export large quantity to Europe, Australia, New Zealand, U.S.A., Canada, South America and African countries. More than 20 years experience of manufacturing on scaffolding has won our customers approval and satisfaction.Please be advised and see the attached catalogue of the products which we are producing: 1)SCAFFOLDING TUBES AND COUPLERS; 2)SCREW JACKS; 3)RINGLOCK SYSTEMS; 4)KWIKSTAGE SYSTEMS; 5)HAKI SYSTEMS; 6)ADJUSTABLE STEEL PROPS 7)FORMWORK AND FORMWORK ACCESSORIES; 8)ALUMINIUM /STEEL FORMWORK
We have many kinds of props,and exported to many countries.If you have this kind of demand,welcome to contact with me.
Our Contact
Send now